ROAD CLOSED – CONSTRUCTION ADVISORY – POLICE PRESENT
Please be advised, on Monday (7/22) from 7am-5pm, construction crews will be on School Road East performing mill and pave operations between Brushneck Road and Warren Drive. The remainder of School Road East between Warren Drive and the Colts Neck Municipal boundary will be resurfaced at the conclusion of the gas main replacement by NJ Natural Gas.