ROAD CONSTRUCTION NOTICE – Week of August 30, 2021
The Marlboro Summer/Fall Road program is underway and construction crews are performing concrete work at various locations throughout the town. Updates will be sent throughout the road program season.
We remind residents that, as per the recycling calendar (LINKED HERE), the road program is in progress and no lawn debris should be curbside until late September as crews pave, patch, repair potholes, and do street sweeping.
Should you wish to report a pothole, please use our convenient, on-line POTHOLE PORTAL
Recycling Notice: Occasionally, a road closure will prevent a scheduled recycling collection. Should this occur, please email
ROAD TO REMAIN OPEN – CONSTRUCTION ADVISORY
These roads will remain accessible during construction, although motorists are advised to use caution through the work zone. The scheduled time frame for this work is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time.
Pheasant Drive, Quail Court, Wren Terrace – Monday (8/30) through Friday (9/3) from 7am-5pm, construction crews will be on Pheasant Drive, Quail Court, and Wren Terrace performing curb restoration as necessary and installing handicap ramps at all intersections.
Crine Road - Monday (8/30) from 7am-5pm, construction crews will be on Crine Road performing mill and pave operations between CR520 and Crine Lane
Brandywine and Revere Court - Tuesday (8/31) through Wednesday (9/1) from 7am-5pm, construction crews will be on Brandywine Drive and Revere Court performing mill and pave operations.
ROAD CLOSED – CONSTRUCTION ADVISORY – POLICE PRESENT
Conover Road – Tuesday (8/31) through Wednesday (9/1) from 7am-5pm, construction crews will be on Conover Road performing mill and pave operations between Pleasant Valley Road and CR520. Detours will be in place, and Police Officers will be on site to assist motorists and residents.
Nolan Road - Thursday (9/2) through Friday (9/3) from 7am-5pm, construction crews will be on Nolan Road performing mill and pave operations between Reids Hill Road and Lloyd Road.
Falson Lane – Monday through Friday from 7am to 4pm through September 3 to complete the road work before the school year begins. Digital and detour signs are posted. The detour will be from Texas Road, to Greenwood Road, to Ticetown Road, to Bernadette Drive for entry into the Woods Development. This is a daytime closure and Falson Lane will be opened each day at 4pm.
The scheduled time frame for roadwork is weather-dependent, and every effort will be made to minimize any inconvenience to residents during this time. Please call Marlboro Traffic and Safety at 732-536-0304 with further inquiries.